Continuing up the branch line. April 23, 2008
Posted by railroadman in Layout Construction, Model Railroading, Trackwork.2 comments
Well I have been doing lots of scenery for the past few months on and off but have come to areas that I can’t proceed until more track work is in place. I am still working on 2 building projects at this time. One to complete Gainesville and a 3 building lumber mill. I had to move a short section of track to better fit in a nice tressel bridge that will be aprox. 2 feet long in total length and will span the valley of two mountains that surround my main town. The tressel itself is in progress as well.
Railroad Track Plan April 9, 2008
Posted by railroadman in Trackwork.1 comment so far
I have been meaning to redraft the final track plan but time has not been on my side so I am posting images of my rough work. It does the job and is to scale but isn’t 100% pretty. The first image here shows Gainesville at the top center with the 6 track off line fiddle yard to the left and Clifton at the end of the branch line to the right. The lower middle shows a scrapped concept of Woodshill and the east end of Gainesville. I have reversed the entrance to the industry where the grade will be more leveled off and repositioned the branch line track work to allow a nice tressel bridge and an additional rock portal. This area is where the mountain range I have just recently finished.

This next image is the other side of the layout room showing Stone Valley and its yard tracks. Walton can be seen in the upper left and Holden should be on the right hand side but is not shown on the draft copy as I added it after I confirmed I had enough scenery room to support it visually.

I have started working on the spline work, roadbed and laying ties up the branch line from Holden to Walton and to Clifton. I will be doing a post shortly showing my spline techniques.
Thanks again for reading and happy railroading.